Burgandy – Laminex Factory
PROJECT SUMAMRY
A new wood panels plant at the current Laminex site in Taupō. The investment involves building a new wood panel production and processing line.
STRUCTURAL FEATURES:
- 900 ton of steel
- Custom welded beams
- Use of temporary works (engineered propping plan to ensure geometric accuracy)
- Precast seating angles.
- Complex lift plans for post erection internal assembly
VALUE WE PROVIDED
Our work on the Burgandy project demonstrates our ability to add measurable value to complex multi-story builds. Key contributions included:
Value Engineering:
- Proposed alternative construction methods to enhance site efficiency through prefabricated lift modules.
- Collaborative tender and value engineering.
Collaborative Engineering:
- Provided engineered lift plans to incorporate methodology.













